Description
The Shockey Precast Group provided architectural precast/prestressed, pre-topped concrete double tees, shear walls, stair walls, columns, beams, spandrels, vertical ramp walls, and slabs for this 1,000-car garage. In all, Shockey fabricated approximately 272,200 square feet of architectural pre-cast concrete double-tees in its Winchester, VA plant. The walls of the elevator tower and the two stair towers are precast. For durability, all double tee flange connections are stainless steel. The exposed precast concrete on the exterior elevations was cast with an architectural concrete face mix using local aggregates. All other products were cast with standard gray concrete and local gray limestone aggregates with a standard form finish.
Location
Baltimore, MD
Type
Parking Structures
Owner
GBMC Healthcare
Contractor
Whiting-Turner Contracting Company
Architect
Walker Parking Consultants
Engineer
Walker Parking Consultants